• Prefabricate steel structure Workshop Prefabricate steel structure Workshop

Prefabricate steel structure Workshop

  • Place of origin : Guangdong
  • Model Number : Steel structure PSSW
  • Price Terms : FOB price
  • Payment Terms : By T/T
  • Package : Seaworthy
  • Minimum Order : 1 set
  • Delivery Time : 30~45 days
  • Brand Name : SBS

Prefabricate steel structure Workshop

Prefabricate-steel-structure-Workshop-1

 

1. The detail material for the steel structure

The steel structure material is included the H section,I section,Square tube,Circular Tube,Floor decking steel sheet,C section,Z section,Angle iron , Steelbar ,Steel plate.

Prefabricate-steel-structure-Workshop-2.jpg

1)Z-Section Sheet

Z steel is common cold bending thin-wall steel, whose thickness is commonly between 1.6-3.0mm, section heights between 120-350mm. Processing materials is hot rolled (paint), galvanized. It is processed according to perform standards. Z steel is usually applied in large steel structure factory building.

2)Hot rolled I-shape beams can be divided into common i-steel and light beams. 

Common i-steel

Main purpose: Ordinary beams are widely used in various building structures, Bridges, vehicles, support and machinery, etc. 

Light beams

Flange of common i-steel and light beams are gradually becoming thinner from root to the edge with certain angle. Compared with ordinary beams, hot rolling light beams has wider leg and thinner waist in same wait height conditions. Guaranteed the bearing capacity, the light beams have better stability, metal saving and better economic effect than ordinary beams.

Main use: The same with ordinary beams, it is mainly used in factories, Bridges and other large structures and vehicle manufacturing, etc.

2. Product details

Product Name

Prefabricated Steel Structure workshop 

 Specification

 Foundation

Concrete and Steel

 Support

X or V types, angle steel or round tube

 Surface

Two layers and anti-rust paint

 Color

White, Grey, Blue, Green, etc

 size

Designed by your requirement

 Main component

 Base materials

Cement and steel foundation bolts

 Main frame

H beam (welded or hot rolled)

 Material

Q35B,Q345B

 Purlin

C purlin (C120-320) or Z Purlin (Z100-200)

 Bracing

Tie bar, lateral bracing, column bracing, knee bracing, etc

 Bolt

Normal bolt, high strength bolts, Galvanized bolt 

 Roof & wall

Sandwich panel, steel corrugated sheet

 Door

Sliding door , rolling shutter

 Window

PVC window, aluminum-alloy Window

 Accessories

Skylight, ventilation, downpipe and galvanized gutter etc .

Required Shear Strength

The required shear strength of the connection shall be based on the load combinations in the applicable building code that include the amplified seismic load. In determining the amplified seismic load the effect of horizontal forces including overstrength,
Emh, shall be taken as: Emh = 2[1.1Mp, exp]/Lh
Connection Diaphragm Plates
Connection diaphragm plates are permitted for filled composite columns both external to the column and internal to the column.
Where diaphragm plates are used, the thickness of the plates shall be at least the thickness of the beam flange.

Prefabricate-steel-structure-Workshop-3_1

 

Prefabricate-steel-structure-Workshop-4.png

3. Transportation

Steel structure is mainly composed of steel column, steel beam, steel frame and the rigid support and so on, so steel structure component volume is larger, The mainly transportation for export is as follow:

1)  Seaworthy

 In general, after customer order, our engineering technology department design the steel structures will be according to the 40 'HQ and 40' open top container inside size  to design the shipment, in most cases, we use 40 'HQ and 40' open top shipping container shipment to pack steel structures.

Prefabricat- steel-structure-Workshop-5.jpgPrefabricate-steel-structure-Workshop-6

 2) Package for the steel frame

If you want to use the 40 HQ container to transportation the whole steel structure product. You can do the steel frame to package ,use the cable wire to fix. But you must paid for the steel frame and baling charges.

Prefabricate-steel-structure-Workshop-7.jpgPrefabricate-steel-structure-Workshop-8.jpg

Prefabricate-steel-structure-Workshop-9.jpg

Recommended products

top
v