The content that requirement of the preparatory work for light steel structure installation is as same as ordinary steel structure installation. When steel column foundation construction, anchor bolts should be prepared to locate and protected and then control the foundation .The top surface elevation of anchor bolts. After the foundation construction, the inspection and acceptance shall be according to the following:
The ranks of the axis position is correct.
All the span meets the design requirements.
Foundation top elevation meets the design requirements.
Steel columns should be pop up in both directions
The component shall be numbered in accordance with the design drawings and marked installation center.
Steel columns should be pop up in both directions to the center sign and the elevation sign; marked lashing point. measuring column length, the length of the error should be recorded and used oil pen to write on the plane next to the center marks under the lower part of the pillar to prepare the foundation top secondary grouting layer surface elevation adjustment.
Members enter the construction site, there must be a detailed quality assurance and inspection records. should kind components models and installation sequence piled in designated areas.
Member strata skids should have enough support to prevent the fulcrum surface subsidence; when the same type of components stack. The pivot of each component in the same straight line. for the deformable member, shall be promptly corrected before installation inspection and approval.